The result in four numbers

/01 · Weight
−22%
/02 · BOM
−14%
/03 · Production cycle
38s
/04 · Compliance
EN 45545-2

The full picture

Challenge

The client - a European electric bus OEM - approached us with a housing design for a low-voltage system control module. The existing ABS version was heavy and did not meet the HL2 fire resistance requirements.

Objectives: weight reduction of at least 15%, compliance with EN 45545-2 R22 / HL2, retention of the existing mounting points on the bus frame, readiness for production of up to 60k pcs per year.

Solution

We proposed an FR grade of PC+ABS with glass fibre in selected structural ribs. We analysed the housing geometry using FEA for mounting stiffness and optimised the rib layout in Moldex3D, including a warpage analysis after the cooling cycle.

The mould was built by a reference EU partner. PPAP level 3 validation; vibration and climatic validation confirmed in the client's laboratory.

Outcome

The component entered series production in Q3 2024. Final weight 22% lower than the baseline version - above the client's target. Component BOM 14% lower thanks to simplified assembly (two metal inserts eliminated and replaced with post-moulding inserts).

Production cycle: 38 s - within the window required by the client's logistics plan. The project is being extended with two further housing size variants for derivative vehicle models.

What was key

  1. An early material decision. Choosing PC+ABS with GF only in selected ribs (local overmoulding) - weight reduction without loss of stiffness.
  2. Warpage simulation. A full thermal model in Moldex3D allowed us to design the mould with directional shrinkage compensation - the housing needs no calibration after ejection.
  3. Early vibration validation. A 3D-printed + CNC-machined prototype was delivered to the client in week 6 - this made it possible to validate the mounting before the mould was built.
“Switching from ABS to PC+ABS GF sounds simple. Doing it without changing the mounting points - not so much. MS-PROGRESS closed the topic in two iterations.” - Senior Engineer · OEM client